Parallel Branches

Multiple steps in a flow can be active at the same time. A e.g. multiple departments need to complete different steps at the same time before the flow can move forward.

Parallel paths at Start

Parallel paths at Start

Parallel paths other than at Start

Parallel paths other than at Start

Conditional parallel paths

Conditional parallel paths

The color purple

The color purple

A connector will turn purple if it is the first connector in a group of parallel connectors. i.e. it illustrates the start of parallel branches.

0 Comments

Add your comment

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.